Amberg Rail Tamping VMS

Contact Details

The flexible tamping survey solution for rail track works.

Easy to use – fully controlled – highly efficient. From preparation through to evaluation

SKU: AmbergVMS Category:

Description

Innovation of a proven principle for track works

  • Digital long chord method
  • Ground-breaking performance of up to 2000 m/h
  • Combined survey of track and lateral distance offsets in one run
  • Greatest operational fl exibility – thanks to twin-trolley-mode and tripod-mode option
  • Integrated fi xed-point measuring device
  • Cost savings of 70 % and more compared to manual / optical chord methods
  • Safe digital data handling – from initial data input to final transfer of correction data
  • Easy handling and fl exible transportation

High performance for long track sections – VMS Twin-Trolley-Mode

  • 1st Choice for measurements during track closures
  • High performance of up to 2 km/h
  • Length of reference chord of up to 250 m
  • Automatic tripod for quick and easy self-levelling of laser tachymeter
  • LED lightening bar assuring safe work during night
  • User friendly handling specially designed for track worker

Greatest fl exibility under demanding project conditions – VMS Tripod-Mode

  • Ideal for short track sections, e.g. turn outs, multi- track sections and projects with limited track access
  • Length of reference chord of up to 400 m
  • Flexible measuring mode – as twin-trolley-mode – complemented by Flex-Stop functionality
  • Immediate measurement stop for rapid track clearance on demand – without impact on performance
  • Modular system design allows upgrading at any time e.g 2nd trolley and other survey applications
Go to Top