Identify track position errors as a basis for construction and maintenance of ballast track
Comprehensive design data definition possibilities (absolute/relative alignment) including various interfaces for import and export
Interactive correction-data preparation for all current tamping machines (e.g. Plasser&Theurer, Matisa, Harsco)
Comprehensive reporting of track alignment and control point data
Integrated control point surveying as a stand-alone option

  • Amberg Rail Tamping GRP 1000

  • Amberg Rail Tamping GRP 3000

  • Amberg Rail Tamping IMS 1000 / 3000

  • Amberg Rail Tamping VMS 1000

  • Amberg Rail Tamping VMS 3000

Title

Go to Top